This project involved a full HVAC remodel of approximately 24,534 sf of conditioned space. The building was equipped with a new membrane roof system to address pre-existing water leaks.
Two new AHUs and one MAU were installed on a newly constructed elevated mechanical platform, covering about 2,074 sf. An 8-inch fiber-reinforced concrete slab was also poured for mechanical equipment housekeeping and future projects.
Additionally, two new chillers were installed to supply the new mechanical equipment and support future equipment upgrades.