Completed Projects - Healthcare Industry
Completed Projects - Healthcare Industry
Wyoming State Hospital
State of Wyoming, State Construction Department
Evanston, Wyoming
Design-Bid-Build
This project was the largest contract our firm has completed to date. With a duration of over 40-months, this project consisted of (1) developing a new parking area for staff to use during construction; (2) construction of a 121,000 sf addition to the existing campus, with high-level security measures similar to a detention center; and (3) 71,000 sf renovation of the existing hospital which was converted into hospitality and administration areas for the entire campus. The facility maintained operational during the entire project.
Gottsche Rehab and Wellness Center Upgrades
William H. & Carrie Gottsche Foundation
Thermopolis, Wyoming
Design-Build
This project was an extensive renovation with a limited budget. Through value engineering and budget alignment, our firm was able to complete the majority of desired improvements. Improvements included (1) separating the utilities (electrical, mechanical, and sewer) from the existing Hot Springs County Hospital next door; (2) completely remove and re-design the entry of the facility (including a new parking lot, canopy and landscaping); and (3) update aesthetics of approximately 9,000 sf including OT/PT areas, administration areas, and kitchen/cafeteria upgrades.
Memorial Hospital of Sweetwater County AHU Upgrades
Memorial Hospital of Sweetwater County
Rock Springs, Wyoming
Construction Manager at Risk
This project included an mechanical system upgrade to the existing decades old system housed in the basement. The new system required construction of a penthouse on the roof. In the dead of winter, a section of the roof had to be removed, directly above critical areas including surgical rooms and administration offices. Our crews ensured minimal disruption to the active facility was experienced. Approximately 14,000s sf renovation to the Medical Imaging Suite, within the heart of the facility was added via change order. This required cutting a construction entrance through an exterior wall with a temporary stair tower to avoid disruption to hospital operations. The adjacency to the surgical suite created a heightened monitoring of infection control measures.
Cody Regional Health - Central Sterile Renovations
Cody Regional Health
Cody, Wyoming
Construction Manager at Risk
This project was an extensive renovation to the active hospital. Work was phased in order to minimize disruption: (1) the third-floor was renovated to relocate the Environmental Services (EVS) Department from their existing space on the ground level. This required new overhead mechanical, electrical, and plumbing (MEP) work to be done in the active OB Clinic on floor below. (2) Additional MEP routing to a mobile sterile unit outside of the building was required to ensure uninterrupted hospital functions. (3) The Post-Anesthesia Care Unit was renovated, including the relocation of a corridor, and the remodel of office and storage space. At times our crews were working within feet of patients, making Infectious Control procedures crucial. (4) Last, the existing EVS space and the existing Central Sterile Unit was completely demolished and renovated with new finishes.